MONO WAY over SULLIVAN CREEK
0.5 MI E OF HWY 108 · County 109, California · Built 1991 · 4 Lanes · 25,060 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
37.9753, -120.348914
This bridge is in worse condition than 93.6% of bridges in County 109. The average bridge in California is 0 years old; this one is 35 years old.
Nearby Bridges
SR 108 over SULLIVAN CRK / BERGEL RD
Built 2004
SR 108 over MONO WAY
Built 2004
SR 108 over SIERRA RR SANGUINETTI RD
Built 2004
SR 108 over SERA & SANGUINETTI RD
Built 1987
SR 108 over HESS AVENUE
Built 2004
OLD WARDS FERRY RD over STATE ROUTE 108
Built 1987
OLD WARDS FERRY RD over SULLIVAN CREEK
Built 1977
LIME KILN RD over SULLIVAN CREEK
Built 1945
ALDER LANE over SULLIVAN CREEK
Built 1960
SR 108 over PEACEFUL OAK RD
Built 2013
Bridge Details
- Structure #
- 32C0079
- Year Built
- 1991
- Length
- 36.6 m (120.1 ft)
- Max Span
- 18 m
- Width
- 24.2 m (79.4 ft)
- Lanes
- 4
- Daily Traffic
- 25,060
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $886,000
- Total Project Cost
- $1,488,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.