CRYSTAL SPRGS CAMP over WEST FORK CARSON RIVER

0.1 MILE SOUTH OF S.H. 88 · County 003, California · Built 1938 · 2 Lanes · 275 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
31C0013
Year Built
1938
Length
16.8 m (55.1 ft)
Max Span
16.2 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
275
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$129,000
Total Project Cost
$216,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.