CALAVERITAS RD over WILLOW CREEK
1.2 MI S OF MOUNTAIN RA R · County 009, California · Built 1925 · 2 Lanes · 256 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
38.177189, -120.6502
This bridge is in worse condition than 94.4% of bridges in County 009. The average bridge in California is 0 years old; this one is 101 years old.
Nearby Bridges
STATE ROUTE 49 over CALAVERITAS CREEK
Built 1930
POOLE STATION ROAD over CALAVERITAS CREEK
Built 2001
TREAT AVENUE over SAN ANDREAS CREEK
Built 1978
CALIFORNIA ST over SAN ANDREAS CREEK
Built 1953
MAIN ST over SAN ANDREAS CREEK
Built 1914
POOL STATION RD over SAN ANTONIO CREEK
Built 2006
CALAVERITAS RD over CALAVERITAS CREEK
Built 1928
POOL STATION ROAD over SAN DOMINGO CREEK
Built 2005
GOLD STRIKE RD over MURRAY CREEK
Built 1949
STATE ROUTE 49 over SAN ANTONIO CREEK
Built 1934
Bridge Details
- Structure #
- 30C0053
- Year Built
- 1925
- Reconstructed
- 1962
- Length
- 7.8 m (25.6 ft)
- Max Span
- 7.8 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 256
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $71,000
- Total Project Cost
- $119,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.