STATE ROUTE 4 over GARDNER LANE

10-CAL-004-R21.42 · County 009, California · Built 2009 · 2 Lanes · 7,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
30 0053
Year Built
2009
Length
87.7 m (287.7 ft)
Max Span
35.1 m
Width
18.9 m (62 ft)
Lanes
2
Daily Traffic
7,900
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.