WOODWARD ISLAND RD over MIDDLE RIVER

0.1 MI W BACON ISLAND RD · County 077, California · Built 2020 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29C0415
Year Built
2020
Length
205.6 m (674.5 ft)
Max Span
30.5 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.