SEXTON RD over SSJID CANAL
0.2 MI N OF RIVER RD · County 077, California · Built 1941 · 2 Lanes · 210 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
37.762486, -121.032819
This bridge is in worse condition than 90.4% of bridges in County 077. The average bridge in California is 0 years old; this one is 85 years old.
Nearby Bridges
VAN ALLEN RD over SSJID CANAL
Built 1928
CARROLTON ROAD over SSJID CANAL
Built 1940
MCHENRY AVENUE over DRY SLOUGH
Built 1962
MCHENRY AVENUE over STANISLAUS RIVER
Built 2019
MCHENRY AVE over SSJID CANAL
Built 2018
AMERICAN AVENUE over M.I.D. MAIN CANAL
Built 1935
DALE ROAD over M.I.D. MAIN CANAL
Built 1925
CARVER over M.I.D. MAIN CANAL
Built 1923
WAGNER RD over SSJID CANAL
Built 1928
TULLY ROAD over M.I.D. MAIN CANAL
Built 1924
Bridge Details
- Structure #
- 29C0319
- Year Built
- 1941
- Length
- 10.1 m (33.1 ft)
- Max Span
- 4.9 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 210
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $177,000
- Total Project Cost
- $297,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.