FINE RD over CHANNEL B
0.2 MI S FLOOD RD · County 077, California · Built 1972 · 2 Lanes · 801 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.014172, -121.049761
This bridge is in worse condition than 8.9% of bridges in County 077. The average bridge in California is 0 years old; this one is 54 years old.
Nearby Bridges
FINE RD over CHANNEL A
Built 1972
FLOOD ROAD over MORMON SLOUGH
Built 1973
FINE ROAD over MORMON SLOUGH
Built 1972
FLOOD ROAD over CHANNEL B
Built 1967
MILTON ROAD over CHANNEL A
Built 1927
MILTON ROAD over CHANNEL A BRANCH
Built 1927
MILTON ROAD over CHANNEL B
Built 1968
ESCALON-BELLOTA RD over CHANNEL C
Built 1965
MILTON ROAD over MORMON SLOUGH
Built 1974
ESCALON-BELLOTA RD over CHANNEL A
Built 1965
Bridge Details
- Structure #
- 29C0228
- Year Built
- 1972
- Length
- 21.9 m (71.9 ft)
- Max Span
- 8.5 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 801
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.