PEZZI RD over CALAVERAS RIVER

0.8 MI S/O EIGHT MI RD · County 077, California · Built 1926 · 2 Lanes · 402 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29C0199
Year Built
1926
Length
19.5 m (64 ft)
Max Span
7.9 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
402
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$119,000
Total Project Cost
$199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.