WEST LANE over BEAR CREEK
1.6 MI N HAMMER LANE · County 077, California · Built 1966 · 4 Lanes · 14,064 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
38.0443, -121.295381
This bridge is in worse condition than 90.4% of bridges in County 077. The average bridge in California is 0 years old; this one is 60 years old.
Nearby Bridges
EIGHT MILE ROAD over PIXLEY CREEK
Built 1963
WEST LANE over MOSHER SLOUGH
Built 1966
WEST LANE over PIXLEY SLOUGH
Built 1962
MORADA LANE over MOSHER SLOUGH
Built 2007
LOWER SACRAMENTO R over WINEDRAW SLOUGH
Built 1957
TAM OSHANTER DR over MOSHER SLOUGH
Built 1981
CHERBOURG WAY over MOSHER SLOUGH
Built 1981
EIGHT MILE ROAD over UP RAILROAD TRACKS
Built 2013
LOWER SAC RD over PIXLEY SLOUGH
Built 1926
EIGHT MILE ROAD over PIXLEY SLOUGH
Built 1969
Bridge Details
- Structure #
- 29C0123
- Year Built
- 1966
- Reconstructed
- 1972
- Length
- 50 m (164 ft)
- Max Span
- 9.1 m
- Width
- 28.1 m (92.2 ft)
- Lanes
- 4
- Daily Traffic
- 14,064
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,923,000
- Total Project Cost
- $4,911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.