WEST LANE over BEAR CREEK

1.6 MI N HAMMER LANE · County 077, California · Built 1966 · 4 Lanes · 14,064 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
29C0123
Year Built
1966
Reconstructed
1972
Length
50 m (164 ft)
Max Span
9.1 m
Width
28.1 m (92.2 ft)
Lanes
4
Daily Traffic
14,064
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,923,000
Total Project Cost
$4,911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.