JACK TONE RD over PADDY CREEK (MIDDLE)

0.5 MI N HARNEY LANE · County 077, California · Built 1962 · 2 Lanes · 2,311 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
29C0079
Year Built
1962
Length
20.7 m (67.9 ft)
Max Span
7.9 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
2,311
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.