99 FRONTAGE RD W over BEAR CREEK
0.4 MI N OF 8 MILE RD · County 077, California · Built 1964 · 2 Lanes · 3,737 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.060469, -121.259919
This bridge is in worse condition than 8.9% of bridges in County 077. The average bridge in California is 0 years old; this one is 62 years old.
Nearby Bridges
STATE ROUTE 99 over BEAR CREEK
Built 1963
99 FRONTAGE RD E over BEAR CREEK
Built 1964
EIGHT MILE RD over STATE ROUTE 99
Built 1964
EIGHT MILE RD over BEAR CREEK
Built 1961
99 W FRONTAGE ROAD over WINE DRAW SLOUGH
Built 1964
EIGHT MILE ROAD over UP RAILROAD TRACKS
Built 2013
PEARSON ROAD over PIXLEY CREEK
Built 1966
99 FRONTAGE RD W over PIXLEY SLOUGH
Built 1964
99 FRONTAGE RD W over MOSHER SLOUGH
Built 1964
STATE ROUTE 99 over MOSHER SLOUGH
Built 1930
Bridge Details
- Structure #
- 29C0068
- Year Built
- 1964
- Length
- 50.4 m (165.4 ft)
- Max Span
- 11 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 3,737
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.