TRACY BOULEVARD over GRANT LINE CANAL

3 MI N OF I 205 · County 077, California · Built 1959 · 2 Lanes · 4,513 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
29C0022
Year Built
1959
Length
143.6 m (471.1 ft)
Max Span
37.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
4,513
Material
Steel
Design
Movable - Bascule
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.