STATE ROUTE 99 over UP RR & FRENCH CAMP ROAD

10-SJ-099-11.47-MTCA · County 077, California · Built 2015 · 8 Lanes · 70,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
29 0332
Year Built
2015
Length
73.2 m (240.2 ft)
Max Span
36.2 m
Width
44.1 m (144.7 ft)
Lanes
8
Daily Traffic
70,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.