INTERSTATE 5 SB over STATE ROUTE 12
10-SJ-005-39.55 · County 077, California · Built 1979 · 3 Lanes · 38,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.115897, -121.398036
This bridge is in worse condition than 52.5% of bridges in County 077. The average bridge in California is 0 years old; this one is 47 years old.
Nearby Bridges
INTERSTATE 5 NB over STATE ROUTE 12
Built 1979
INTERSTATE 5 NB over THORNTON ROAD
Built 1976
INTERSTATE 5 SB over THORNTON ROAD
Built 1976
COTTA ROAD over UPLAND CANAL
Built 1974
INTERSTATE 5 NB over TURNER ROAD
Built 1979
INTERSTATE 5 SB over TURNER ROAD
Built 1979
INTERSTATE 5 NB over WOODBRIDGE ROAD
Built 1979
INTERSTATE 5 SB over WOODBRIDGE ROAD
Built 1979
RIO BLANCO ROAD over TELEPHONE CUT
Built 1953
EIGHT MILE ROAD over BISHOP CANAL
Built 1989
Bridge Details
- Structure #
- 29 0255L
- Year Built
- 1979
- Length
- 63.4 m (208 ft)
- Max Span
- 31.5 m
- Width
- 20.9 m (68.6 ft)
- Lanes
- 3
- Daily Traffic
- 38,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.