INTERSTATE 5 SB over BARBER ROAD

10-SJ-005-49.18 · County 077, California · Built 1979 · 2 Lanes · 26,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29 0248L
Year Built
1979
Length
29.2 m (95.8 ft)
Max Span
28.7 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
26,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.