E&W4-S5 CONNECTOR over CHURCH STREET

10-SJ-004-R16.00-STKN · County 077, California · Built 1972 · 3 Lanes · 19,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
29 0231H
Year Built
1972
Length
32.9 m (107.9 ft)
Max Span
32 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
19,400
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.