INTERSTATE 205 EB over UP RR

10-SJ-205-R11.60 · County 077, California · Built 1970 · 3 Lanes · 48,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29 0179R
Year Built
1970
Reconstructed
2010
Length
73.9 m (242.5 ft)
Max Span
28 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
48,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.