INTERSTATE 5 NB over BEAR CREEK

10-SJ-005-34.25 · County 077, California · Built 1975 · 3 Lanes · 48,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29 0177R
Year Built
1975
Length
66.4 m (217.8 ft)
Max Span
12.2 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
48,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.