INTERSTATE 5 SB over WEBER PERSHING FREMONT
10-SJ-005-26.47-STKN · County 077, California · Built 1972 · 5 Lanes · 113,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.95155, -121.303569
This bridge is in worse condition than 90.4% of bridges in County 077. The average bridge in California is 0 years old; this one is 54 years old.
Nearby Bridges
INTERSTATE 5 NB over WEBER PERSHING FREMONT
Built 1972
WEBER ST over MORMON SLOUGH
Built 1969
SR 4 WB over E4-N5 W4-S5 CONN RAMPS
Built 1972
SR 4 EB over E4-N5 W4-S5 CONN RAMPS
Built 1972
INTERSTATE 5 NB over STATE ROUTE 4
Built 1972
INTERSTATE 5 SB over STATE ROUTE 4
Built 1972
EB 4 OFF-RAMP over MORMON SLOUGH
Built 1972
WB 4 ON-RAMP over MORMON SLOUGH
Built 1972
W4-N&S5 CONNECTOR over LINCOLN UP RR BNSF RY
Built 1972
SR 4 WB over LINCOLN UP RR BNSF RY
Built 1972
Bridge Details
- Structure #
- 29 0176L
- Year Built
- 1972
- Length
- 830.6 m (2725.1 ft)
- Max Span
- 109.7 m
- Width
- 20.7 m (67.9 ft)
- Lanes
- 5
- Daily Traffic
- 113,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $55,542,000
- Total Project Cost
- $93,311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.