INTERSTATE 5 NB over FOURTEEN MILE SLOUGH
10-SJ-005-31.00-STKN · County 077, California · Built 1968 · 8 Lanes · 111,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.9984, -121.348642
This bridge is in worse condition than 8.9% of bridges in County 077. The average bridge in California is 0 years old; this one is 58 years old.
Nearby Bridges
INTERSTATE 5 NB over W SWAIN ROAD
Built 1970
FEATHER RIVER DR over FOURTEEN MILE SLOUGH
Built 1992
INTERSTATE 5 NB over W BENJAMIN HOLT DR
Built 1970
INTERSTATE 5 NB over W MARCH LANE
Built 1970
INTERSTATE 5 over FIVE MILE SLOUGH
Built 1970
N5-MARCH LN OFFRMP over EBMUD AQUEDUCT
Built 1970
INTERSTATE 5 NB over EBMUD AQUEDUCT
Built 1970
INTERSTATE 5 NB over BROOKSIDE CALAVERAS RIV
Built 1968
INTERSTATE 5 NB over W HAMMER LANE
Built 1970
INTERSTATE 5 SB over W HAMMER LANE
Built 1970
Bridge Details
- Structure #
- 29 0175
- Year Built
- 1968
- Reconstructed
- 2017
- Length
- 65.2 m (213.9 ft)
- Max Span
- 9.8 m
- Width
- 54.5 m (178.8 ft)
- Lanes
- 8
- Daily Traffic
- 111,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.