ACAMPO ROAD over STATE ROUTE 99
10-SJ-099-33.57 · County 077, California · Built 1957 · 2 Lanes · 1,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
38.174703, -121.262203
This bridge is in worse condition than 90.4% of bridges in County 077. The average bridge in California is 0 years old; this one is 69 years old.
Nearby Bridges
WOODBRIDGE ROAD over STATE ROUTE 99
Built 1956
PELTIER ROAD over STATE ROUTE 99
Built 1957
99 E FRONTAGE ROAD over GILL CREEK
Built 1960
STATE ROUTE 99 SB over MOKELUMNE RI FRONTAGE R
Built 1957
STATE ROUTE 99 NB over MOKELUMNE RI FRONTAGE R
Built 1930
TURNER ROAD over STATE ROUTE 99
Built 1963
JAHANT RD over STATE ROUTE 99
Built 1957
NORTH LODI OC over STATE ROUTE 99
Built 1963
LOWER SACRAMENTO R over MOKELUMNE RIVER
Built 1969
LOWER SACRAMENTO R over MOKELUMNE RIVER OVERFLOW
Built 1969
Bridge Details
- Structure #
- 29 0146
- Year Built
- 1957
- Length
- 55.5 m (182.1 ft)
- Max Span
- 17.7 m
- Width
- 10.3 m (33.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,600
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $573,000
- Total Project Cost
- $962,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.