RICHMOND PARKWAY over SAN PABLO CREEK

AT PARR BLVD · County 013, California · Built 1989 · 5 Lanes · 32,244 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
28C0460
Year Built
1989
Reconstructed
1994
Length
31.9 m (104.7 ft)
Max Span
10.7 m
Width
39.8 m (130.6 ft)
Lanes
5
Daily Traffic
32,244
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.