NORTH LAKE DRIVE over LAKE ALHAMBRA

AT EAST 13TH ST · County 013, California · Built 1961 · 2 Lanes · 1,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
28C0424
Year Built
1961
Reconstructed
1987
Length
10.1 m (33.1 ft)
Max Span
3.2 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,500
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$196,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.