GREENBROOK DR over COW CREEK

0.6 MI E CAMINO RAMON · County 013, California · Built 1971 · 2 Lanes · 7,643 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
28C0392
Year Built
1971
Length
12.5 m (41 ft)
Max Span
8.2 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
7,643
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.