SHELL AVE over ARROYO DEL HAMBRE
300 FT EST OF ALHAMBRA AV · County 013, California · Built 1955 · 2 Lanes · 4,900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
38.003522, -122.129622
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 71 years old.
Nearby Bridges
BROWN ST over ARROYO DEL HAMBRE
Built 1929
ARNOLD DRIVE over BNSF RY
Built 1975
SUSANA ST over ARROYO DEL HAMBRE
Built 1987
STATE ROUTE 4 over ABANDONED BNSF RY SPUR
Built 1967
STATE ROUTE 4 over BNSF RY
Built 1938
CENTER AVENUE over STATE ROUTE 4
Built 1975
STATE ROUTE 4 WB over ALHAMBRA WAY
Built 1967
STATE ROUTE 4 EB over ALHAMBRA WAY
Built 1967
STATE ROUTE 4 WB over ALHAMBRA AVE
Built 1967
STATE ROUTE 4 EB over ALHAMBRA AVE
Built 1967
Bridge Details
- Structure #
- 28C0367
- Year Built
- 1955
- Length
- 13.7 m (44.9 ft)
- Max Span
- 13.1 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 4,900
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $384,000
- Total Project Cost
- $645,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.