DETROIT AVE over PINE CREEK

AT WHITMAN RD · County 013, California · Built 1960 · 2 Lanes · 4,493 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28C0358
Year Built
1960
Length
15.2 m (49.9 ft)
Max Span
14.9 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
4,493
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.