GREGORY LN over GRAYSON CREEK

0.4 MI W CONTRA COSTA BL · County 013, California · Built 1959 · 4 Lanes · 10,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
28C0348
Year Built
1959
Length
6.2 m (20.3 ft)
Max Span
6.2 m
Width
22.2 m (72.8 ft)
Lanes
4
Daily Traffic
10,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.