BOLLINGER CANYON over MAIN BRANCH ALAMO CREEK

1 MI E CROW CANYON RD · County 013, California · Built 2006 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28C0240R
Year Built
2006
Length
42.1 m (138.1 ft)
Max Span
40.9 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.