BAILEY ROAD over MOUNT DIABLO CREEK

0.2 MI NE CONCORD BLVD · County 013, California · Built 2003 · 2 Lanes · 5,858 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
28C0110
Year Built
2003
Length
13.1 m (43 ft)
Max Span
12.7 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
5,858
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.