STATE ROUTE 4 WB over BART TRACKS ACCESS ROAD

04-CC-004-R29.69-ANT · County 013, California · Built 2016 · 4 Lanes · 47,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
28 0408L
Year Built
2016
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
47,000
Material
Concrete
Design
Frame (except frame culverts)
Owner
Railroad
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.