STATE ROUTE 4 EB over CONTRA LOMA BLVD
04-CC-004-26.93-ANT · County 013, California · Built 2015 · 4 Lanes · 57,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.999333, -121.821889
This bridge is in worse condition than 12.2% of bridges in County 013. The average bridge in California is 0 years old; this one is 11 years old.
Nearby Bridges
STATE ROUTE 4 WB over CONTRA LOMA BLVD
Built 2015
G STREET over STATE ROUTE 4
Built 2014
G ST over UP RR
Built 1967
PUTNAM STREET over WEST ANTIOCH CREEK
Built 1973
WEST TENTH STREET over WEST ANTIOCH CREEK
Built 2017
STATE ROUTE 4 WB over A STREET
Built 2016
STATE ROUTE 4 EB over A STREET
Built 2016
WB ROUTE 4 OFFRAMP over SOMERSVILLE ROAD
Built 2012
STATE ROUTE 4 EB over SOMERSVILLE ROAD
Built 2013
STATE ROUTE 4 WB over SOMERSVILLE ROAD
Built 2013
Bridge Details
- Structure #
- 28 0399R
- Year Built
- 2015
- Length
- 49.4 m (162.1 ft)
- Max Span
- 24 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 57,000
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.