STATE ROUTE 4 WB over FRANKLIN CANYON RD

04-CC-004-R2.70L · County 013, California · Built 2001 · 2 Lanes · 40,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28 0370L
Year Built
2001
Length
33.5 m (109.9 ft)
Max Span
33.5 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
40,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.