INTERSTATE 80 WB over CARQUINEZ STRAITS RR
04-CC-080-13.80-VAL · County 013, California · Built 2003 · 4 Lanes · 154,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.055956, -122.225958
This bridge is in worse condition than 46.8% of bridges in County 013. The average bridge in California is 0 years old; this one is 23 years old.
Nearby Bridges
INTERSTATE 80 EB over CARQUINEZ STRAIT UP RR
Built 1958
WB80-POMONA ST OFF over DOWRELIO DR
Built 2003
POMONA ST-WB 80 ON over WANDA POMONA VIRGINIA
Built 2003
INTERSTATE 80 WB over SAN PABLO ETC. UP RR
Built 2003
EB80-POMONA ST OFF over POMONA ST WANDA ST
Built 2003
CUMMINGS SKYWAY over INTERSTATE 80
Built 1958
CARQUINEZ SCENIC D over ECKLEY SLIDE
Built 1919
INTERSTATE 80 over E80-N29 CONNECTOR RAMP
Built 2023
INTERSTATE 80 over REFINERY ACCESS RD
Built 1958
INTERSTATE 80 over REFINERY ACCESS RD
Built 1958
Bridge Details
- Structure #
- 28 0352L
- Year Built
- 2003
- Length
- 1056 m (3464.6 ft)
- Max Span
- 728 m
- Width
- 29.1 m (95.5 ft)
- Lanes
- 4
- Daily Traffic
- 154,000
- Material
- Steel Continuous
- Design
- Suspension
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.