BART ACCESS ROAD over E4-BAILEY RD OFF RAMP

04-CC-004-R19.98 · County 013, California · Built 1997 · 3 Lanes · 12,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
28 0320S
Year Built
1997
Length
12.9 m (42.3 ft)
Max Span
12 m
Width
20.5 m (67.3 ft)
Lanes
3
Daily Traffic
12,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.