E80-MACDONALD OFF over MACDONALD AVE & E80 OFF

04-CC-080-2.59-RCH · County 013, California · Built 1979 · 1 Lanes · 4,420 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28 0082S
Year Built
1979
Length
84.4 m (276.9 ft)
Max Span
33.5 m
Width
8.3 m (27.2 ft)
Lanes
1
Daily Traffic
4,420
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.