KERNER BLVD over INDST PRK DRAINAGE CANAL

N/O IRENE ST S/O BELLAM · County 041, California · Built 1972 · 2 Lanes · 3,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
27C0173
Year Built
1972
Length
13.6 m (44.6 ft)
Max Span
12.5 m
Width
21.5 m (70.5 ft)
Lanes
2
Daily Traffic
3,600
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$687,000
Total Project Cost
$1,155,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.