DOHERTY DR over ARROYO HOLON

AT ROSE LANE · County 041, California · Built 2014 · 2 Lanes · 6,381 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
27C0161
Year Built
2014
Length
16.7 m (54.8 ft)
Max Span
15.9 m
Width
21.4 m (70.2 ft)
Lanes
2
Daily Traffic
6,381
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.