IGNACIO BOULEVARD over U.S. HIGHWAY 101
04-MRN-101-18.09-NVTO · County 041, California · Built 1964 · 6 Lanes · 12,900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.066325, -122.537325
This bridge is in worse condition than 92.8% of bridges in County 041. The average bridge in California is 0 years old; this one is 62 years old.
Nearby Bridges
IGNACIO BLVD over NCRRA\NWP RR
Built 1984
U.S. HIGHWAY 101 over ARROYO DE SAN JOSE
Built 1928
BEL MARIN KEYS BL over ARROYO SAN JOSE
Built 1970
IGNACIO BLVD over ARROYO SAN JOSE
Built 1960
NORTH HAMILTON PKW over PACHECO CREEK
Built 2001
BEL MARIN KEYS BL over NOVATO CREEK DRAIN
Built 1960
S NOVATO BLVD over W37-S101 CONNECTOR RAMP
Built 1964
S101-E37 & NOVATO- over U.S. HIGHWAY 101
Built 1964
MAIN GATE ROAD over SMART RAILROAD
Built 1930
N&S101-E37 CONNCTR over S NOVATO BL N101 & NWPRR
Built 1964
Bridge Details
- Structure #
- 27 0083
- Year Built
- 1964
- Length
- 81.7 m (268 ft)
- Max Span
- 22.9 m
- Width
- 28 m (91.9 ft)
- Lanes
- 6
- Daily Traffic
- 12,900
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,291,000
- Total Project Cost
- $3,848,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.