MAIN STREET over AMADOR CREEK

WATER STREET · County 005, California · Built 2014 · 2 Lanes · 2,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
26C0055
Year Built
2014
Length
11.9 m (39 ft)
Max Span
10.4 m
Width
20.6 m (67.6 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$471,000
Total Project Cost
$791,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.