U.S. HIGHWAY 50 over SLY PARK ROAD

03-ED-050-R31.30-PLKP · County 017, California · Built 2014 · 4 Lanes · 11,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
25 0150
Year Built
2014
Length
22.3 m (73.2 ft)
Max Span
21.3 m
Width
28.3 m (92.8 ft)
Lanes
4
Daily Traffic
11,350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.