U.S. HIGHWAY 50 over PYRAMID CREEK

03-ED-050-59.77 · County 017, California · Built 1980 · 3 Lanes · 13,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
25 0009
Year Built
1980
Length
7 m (23 ft)
Max Span
6.7 m
Width
21.1 m (69.2 ft)
Lanes
3
Daily Traffic
13,100
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.