NUT TREE PARKWAY over PUTAH SOUTH CANAL
500 FEET E HARBISON DR · County 095, California · Built 1993 · 2 Lanes · 15,420 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.364447, -121.963686
This bridge is in worse condition than 12.6% of bridges in County 095. The average bridge in California is 0 years old; this one is 33 years old.
Nearby Bridges
ALLISON DRIVE over INTERSTATE 80 & RAMPS
Built 1997
NUT TREE ROAD over I 80 CONNECTORS RAMP
Built 1963
ULATIS DR over PUTAH SOUTH CANAL
Built 1993
ALLISON DRIVE over PINE TREE CREEK
Built 2000
S505-E80 CONNECTOR over INTERSTATE 80 & S505-W80
Built 1963
ALLISON DR over ULATIS CREEK
Built 1992
ULATIS DR over ULATIS CREEK
Built 1986
E. MONTE VISTA AVE over HORSE CREEK
Built 1963
INTERSTATE 80 WB over PINE TREE CREEK
Built 1963
NUT TREE RD over ULATIS CREEK
Built 1970
Bridge Details
- Structure #
- 23C0224
- Year Built
- 1993
- Length
- 23.5 m (77.1 ft)
- Max Span
- 22.6 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 15,420
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.