ALAMO DR over PUTAH SOUTH CANAL

0.5 MI W OF NUT TREE RD · County 095, California · Built 1950 · 4 Lanes · 20,190 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
23C0143
Year Built
1950
Reconstructed
1983
Length
12.5 m (41 ft)
Max Span
6.1 m
Width
23.2 m (76.1 ft)
Lanes
4
Daily Traffic
20,190
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.