E12-E80 CONNECTOR over INTERSTATE ROUTE 80

04-SOL-012-R2.76-AMCN · County 095, California · Built 2022 · 2 Lanes · 42,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
23 0257G
Year Built
2022
Length
151.5 m (497 ft)
Max Span
75.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
42,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.