STATE ROUTE 12 over ALONZO DRAIN

04-SOL-012-L2.94-FRFD · County 095, California · Built 1980 · 4 Lanes · 40,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
23 0228
Year Built
1980
Length
20 m (65.6 ft)
Max Span
3.1 m
Width
30.1 m (98.8 ft)
Lanes
4
Daily Traffic
40,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$604,000
Total Project Cost
$1,014,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.