INTERSTATE 80 EB over SWEENEY CREEK

04-SOL-080-32.90 · County 095, California · Built 1946 · 3 Lanes · 60,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
23 0083R
Year Built
1946
Reconstructed
2000
Length
23.6 m (77.4 ft)
Max Span
9.1 m
Width
19.4 m (63.6 ft)
Lanes
3
Daily Traffic
60,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.