STATE ROUTE 37 over NAPA RIVER AND WILSON AV
04-SOL-037-R7.39-VAL · County 095, California · Built 1963 · 4 Lanes · 33,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.122022, -122.27635
This bridge is in worse condition than 93.9% of bridges in County 095. The average bridge in California is 0 years old; this one is 63 years old.
Nearby Bridges
SACRAMENTO ST over STATE ROUTE 37
Built 2004
WALNUT ST over STATE ROUTE 37
Built 1967
G STREET over NAPA RIVER
Built 1934
G STREET over MARE ISLAND
Built 2016
STATE ROUTE 37 over WHITE SLOUGH
Built 2004
SACRAMENTO STREET over RR TRACKS
Built 2022
S29-W37 CONNECTOR over CHABOT CREEK
Built 2005
STATE ROUTE 37 over ST RTE 29 CHABOT CREEK
Built 2005
STATE ROUTE 29 over CHABOT CREEK
Built 1960
N29-E37 CONNECTOR over CHABOT CREEK
Built 2005
Bridge Details
- Structure #
- 23 0064
- Year Built
- 1963
- Reconstructed
- 1998
- Length
- 999.8 m (3280.2 ft)
- Max Span
- 57.3 m
- Width
- 22.6 m (74.1 ft)
- Lanes
- 4
- Daily Traffic
- 33,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $22,989,000
- Total Project Cost
- $38,621,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.