INTERSTATE 80 over SUISUN CREEK
04-SOL-080-14.55 · County 095, California · Built 1932 · 13 Lanes · 202,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
38.231261, -122.112483
This bridge is in worse condition than 93.9% of bridges in County 095. The average bridge in California is 0 years old; this one is 94 years old.
Nearby Bridges
EB 80 OFF-RAMP over SUISUN CREEK
Built 2013
SUISUN PARKWAY over SUISUN CREEK
Built 2010
CORDELIA ROAD over SUISUN CREEK
Built 2007
BUSINESS CENTER DR over DAN WILSON CREEK
Built 2010
INTERSTATE 80 over DAN WILSON CREEK
Built 1951
EB 80-EB 12 CONNEC over EB 80 ON-RAMP
Built 2013
ROCKVILLE ROAD over SUISUN CREEK
Built 1966
SUISUN VALLEY ROAD over INTERSTATE 80 & RAMPS
Built 1961
LINK ROAD over DAN WILSON CREEK
Built 2010
W12-W80 CONNECTOR over INTERSTATE 80
Built 1987
Bridge Details
- Structure #
- 23 0007
- Year Built
- 1932
- Reconstructed
- 1971
- Length
- 22.2 m (72.8 ft)
- Max Span
- 7.3 m
- Width
- 57.9 m (190 ft)
- Lanes
- 13
- Daily Traffic
- 202,000
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,121,000
- Total Project Cost
- $1,883,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.