INTERSTATE 80 over GREEN VALLEY CREEK

04-SOL-080-12.91-FRFD · County 095, California · Built 1928 · 11 Lanes · 189,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
23 0004
Year Built
1928
Reconstructed
2009
Length
24.4 m (80.1 ft)
Max Span
11.6 m
Width
47.8 m (156.8 ft)
Lanes
11
Daily Traffic
189,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,743,000
Total Project Cost
$4,609,000