LA RUE ROAD over PUTAH CREEK
30 FT N ARBORETUM DR · County 113, California · Built 2020 · 2 Lanes · 5,810 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.533964, -121.752022
This bridge is in worse condition than 9.9% of bridges in County 113. The average bridge in California is 0 years old; this one is 6 years old.
Nearby Bridges
MRAK HALL DR over PUTAH CREEK
Built 1965
INTERSTATE 80 WB over UP RR BNSF RY & AMTRAK
Built 1974
INTERSTATE 80 EB over UP RR BNSF RY & AMTRAK
Built 1974
INTERSTATE 80 WB over OLD DAVIS ROAD
Built 1974
INTERSTATE 80 EB over OLD DAVIS ROAD
Built 1974
OLD DAVIS RD over PUTAH CREEK
Built 1965
W80-N113 CONNECTOR over OLD DAVIS RD-W80 ON-RAMP
Built 1974
INTERSTATE 80 over BIKE & PEDESTRIAN TUNNEL
Built 2001
WEST CHILES ROAD over BIKE & PEDESTRIAN PATH
Built 2000
S113-E80 CONNECTOR over I-80 (@ PM R43.02)
Built 1974
Bridge Details
- Structure #
- 22I0004
- Year Built
- 2020
- Length
- 30.8 m (101 ft)
- Max Span
- 29.6 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 2
- Daily Traffic
- 5,810
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.